| Project ROCK -
Restoration of Old Cumbernauld Kirk |
|
|
The aims
of Project ROCK are two-fold: to repair (or replace) the roof of the
Parish Church building in Baronhill, and to completely renovate the
outhouse at the manse to provide proper accommodation for the Thrift
Shop and J-Team.
Phase
One of this project, the renewal of the church roof and the subsequent
refurbishment of the worship sanctuary, was completed in August 2015
and a service of
celebration and thanksgiving took place on the evening of Sunday 30th
August 2015.
The background to the project
is outlined below, and it's clear why this has been such a
major undertaking for the congregation.
The present roof was put on between 1721 and 1739 (no-one
seems sure when) and time has taken its toll. Also, as we don't have a
church hall, our Sunday School
in the Village (the J-Team) used to meet in the Village Primary School.
However, since its closure, the children have been meeting in
a
number of
different locations, which is far from ideal. So we are
looking at
whether the manse
outbuildings can be extended and modernised into a Church Hall.
The
outbuildings had housed our Thrift Shop for several years but,
as
they became unsuitable over time, it is hoped that their
renovation can also allow us re-open the Thrift Shop.
Following a regular review by Falkirk Presbytery in 1999 Cumbernauld
Old commissioned two surveys to be carried out on the Church buildings.
The subsequent reports recommended, among other things, the replacement
of the Church roof as well as further repairs to the structure and
stonework of the church building.
Because
we were in the process of appointing a new minister at that time,
nothing was done immediately but two further independent surveys were
commissioned in 2003 specifically, this time, concentrating on the
state of the roof. Their conclusions were similar to the earlier
surveys and so we decided to act.
In 2004, a
project team was set up and they started co-opting people to work on
what was going to be a major project for our congregation. A
comprehensive Business Plan was drafted, including an inventory of all
the necessary repairs and upgrades, including replacing the electrical
wiring as it was (at that time) over 25 years old, provision for
temporary
accommodation during the works (if required), etc.
As
our church is “B” listed and the manse outbuilding is “C” listed by
Historic Scotland we did not have a free hand to do what we wanted.
That, and a whole series of other complexities and difficulties, meant
a rather long drawn-out process. However, because of our
Historic
Scotland listing, we were eventually in a position to
get grants
from them and the
Heritage Lottery Fund to cover some of the cost of the roof renovation
(Phase One of Project ROCK). Grants, of course, will not cover
the
total cost of the project and so we also have had a
major fund-raising
programme underway since 2004.
Everything we do has to have the approval of the Church of Scotland
General Trustees, who are the owners of the church building, and we are
in constant discussion with them about the
way forward.
A project of this magnitude requires the support of everyone
in
the Church, the parish and the wider community of Cumbernauld, if we
wish to
preserve our church buildings for future generations.
For more information, check out our Latest
News and Fundraising
pages. Please contact the minister (phone number above) if you can help.
|
|
|